top of page

Winter Projects

for those wondering what we get up to over the winter closed season

Winter 25/26 - this winter season we have started with a thorough trim up of the trees and hedges, short back and sides, with a little off the top. a fresh new Vanity unit is due to go in photos to follow. as more projects occur we'll update this gallery with before and after pictures


Winter 24/25 - was a busy time for us on site, on top of the usual house keeping activities, we also managed to squeeze in a total rebuild of the reception area, clearing out the old gravel and matted walk way and replacing with a lovely slabbed area with soak away drainage gully, and two very nice railway sleeper flower beds.

Gallery

bottom of page